Requirement
State the changed task, accepted production result and retained/modified/replaced boundary. Name interface, affected-function review and production-release responsibilities.

Prepare a robot cell retrofit brief with current drawings and program versions, parts, tooling, interfaces, changeover limits and agreed acceptance cases.
Supply current drawings, program/configuration versions, tooling and fixture details, available safety documentation and known obsolete components. Describe the new parts and task, actual arrival conditions, complete cycle, line interfaces and allowed changeover window, with representative normal and difficult cases.
Use the scope comparison and acceptance plan to separate confirmed facts from untested assumptions. Name who owns backups, change approval, recovery, affected-function checks and production release.
Plan robot cell retrofits around your parts, process, cycle time, tooling, recovery and acceptance criteria. Discuss the highest-risk feasibility questions with Oxford Industrial Automation. A clear brief should state the operating range for part, product and process variation for existing robot-cell upgrades and your requirements for run-off criteria and production evidence.
Discuss your application

State the changed task, accepted production result and retained/modified/replaced boundary. Name interface, affected-function review and production-release responsibilities.
Describe the intended part mix, arrival variation, complete cycle and connected-equipment conditions. Identify current limits, obsolete components and uncertainties needing a survey or trial.
Agree representative normal, difficult, changeover and recovery cases with expected results and repetitions. Retain baseline and installed versions, discrepancies and retests with the release record.
For robot cell retrofits, use “shall” only for a requirement that can be demonstrated. Keep preferences, assumptions, provisional line connections and future options clearly separate.
Your final robot cell retrofits scope must also account for operator access, recovery and changeover, run-off criteria and production evidence, current regulations and the conditions at your site.